Agile Methodology: What is Agile Model in Software Testing?

Everyone talks about agile development, but how does it really work? Get an overview of how teams collaborate using scrum, kanban, and other popular agile methodologies.

What is Agile Methodology?

Agile Methodology meaning a practice that promotes continuous iteration of development and testing throughout the software development lifecycle of the project. In the Agile model in software testing, both development and testing activities are concurrent, unlike in the Waterfall model.


What is Agile Software Development?

The Agile software development methodology is one of the simplest and most effective processes to turn a vision for a business need into software solutions. Agile is a term used to describe software development approaches that employ continual planning, learning, improvement, team collaboration, evolutionary development, and early delivery. It encourages flexible responses to change.

Agile software development emphasizes four core values.

  1. Individual and team interactions over processes and tools
  2. Working software over comprehensive documentation
  3. Customer collaboration over contract negotiation
  4. Responding to change by following a plan

Agile Model Vs Waterfall Model

Agile and Waterfall models are two different methods for the software development process. Though they are different in their approach, both methods are useful at times, depending on the requirement and the type of the project.

Agile Model Waterfall Model
  • Agile methodology definition: Agile methodologies propose an incremental and iterative approaches to software design
  • Waterfall Model: Development of the software flows sequentially from start point to endpoint.
  • The Agile process in software engineering is broken into individual models that designers work on
  • The design process is not broken into an individual models
  • The customer has early and frequent opportunities to look at the product and make decisions and changes to the project
  • The customer can only see the product at the end of the project
  • The agile model is considered unstructured compared to the waterfall model
  • Waterfall models are more secure because they are so plan oriented
  • Small projects can be implemented very quickly. For large projects, it is difficult to estimate the development time.
  • All sorts of projects can be estimated and completed.
  • The error can be fixed in the middle of the project.
  • Only at the end, the whole product is tested. If the requirement error is found or any changes have to be made, the project has to start from the beginning
  • The development process is iterative, and the project is executed in short (2-4) weeks iterations. Planning is very less.
  • The development process is phased, and the phase is much bigger than the iteration. Every phase ends with a detailed description of the next phase.
  • Documentation attends less priority than software development
  • Documentation is a top priority and can even use for training staff and upgrade the software with another team
  • Every iteration has its own testing phase. It allows implementing regression testing every time new functions or logic are released.
  • Only after the development phase, the testing phase is executed because separate parts are not fully functional.
  • In agile testing when an iteration ends, shippable features of the product are delivered to the customer. New features are usable right after the shipment. It is useful when you have good contact with customers.
  • All features developed are delivered at once after the long implementation phase.
  • Testers and developers work together
  • Testers work separately from developers
  • At the end of every sprint, user acceptance is performed
  • User acceptance is performed at the end of the project.
  • It requires close communication with developers and together analysing requirements and planning
  • The developer does not involve in the requirement and planning process. Usually, time delays between tests and coding

Agile Process

Check the below Agile methodology process to deliver successful systems quickly.

 

Agile Process Model

There are various Agile methods present in agile testing, and those are listed below:


Scrum

SCRUM is an agile development method which concentrates specifically on how to manage tasks within a team-based development environment. Basically, Scrum is derived from activity that occurs during a rugby match. Scrum believes in empowering the development team and advocates working in small teams (say- 7 to 9 members). Agile and Scrum consist of three roles, and their responsibilities are explained as follows:

 

Scrum Method

 

  • Scrum Master
    • Scrum Master is responsible for setting up the team, and sprint meetings and removing obstacles to progress
  • Product owner
    • The Product Owner creates the product backlog, prioritizes the backlog and is responsible for the delivery of the functionality at each iteration
  • Scrum Team
    • The team manages its own work and organizes the work to complete the sprint or cycle

Product Backlog

This is a repository where requirements are tracked with details on the no of requirements(user stories) to be completed for each release. It should be maintained and prioritized by the Product Owner, and it should be distributed to the scrum team. The team can also request a new requirement addition or modification or deletion


Scrum Practices

Practices are described in detail:

Scrum Practices

Process flow of Scrum Methodologies:

The process flow of scrum testing is as follows:

  • Each iteration of a scrum is known as Sprint
  • The product backlog is a list where all details are entered to get the end-product
  • During each Sprint, top user stories of Product backlog are selected and turned into Sprint backlog
  • The team works on the defined sprint backlog
  • Team checks for the daily work
  • At the end of the sprint, the team delivers product functionality

Extreme Programming (XP)

The extreme Programming technique is very helpful when there are constantly changing demands or requirements from the customers or when they are not sure about the functionality of the system. It advocates frequent “releases” of the product in short development cycles, which inherently improves the productivity of the system and also introduces a checkpoint where any customer requirements can be easily implemented. The XP develops software keeping customers on the target.

Extreme Programming

Business requirements are gathered in terms of stories. All those stories are stored in a place called the parking lot.

In this type of methodology, releases are based on the shorter cycles called Iterations with a span of 14 days time period. Each iteration includes phases like coding, unit testing and system testing where at each phase some minor or major functionality will be built into the application.


Phases of eXtreme programming:

There are 6 phases available in the Agile XP method, and those are explained as follows:

Planning

  • Identification of stakeholders and sponsors
  • Infrastructure Requirements
  • Security-related information and gathering
  • Service Level Agreements and their conditions

Analysis

  • Capturing of Stories in the Parking lot
  • Prioritize stories in the Parking lot
  • Scrubbing of stories for estimation
  • Define Iteration SPAN(Time)
  • Resource planning for both Development and QA teams

Design

  • Break down of tasks
  • Test Scenario preparation for each task
  • Regression Automation Framework

Execution

  • Coding
  • Unit Testing
  • Execution of Manual test scenarios
  • Defect Report generation
  • Conversion of Manual to Automation regression test cases
  • Mid-Iteration review
  • End of Iteration review

Wrapping

  • Small Releases
  • Regression Testing
  • Demos and reviews
  • Develop new stories based on the need
  • Process Improvements based on end of iteration review comments

Closure

  • Pilot Launch
  • Training
  • Production Launch
  • SLA Guarantee assurance
  • Review SOA strategy
  • Production Support

There are two storyboards available to track the work on a daily basis, and those are listed below for reference.

  • Story Cardboard
    • This is a traditional way of collecting all the stories on a board in the form of stick notes to track daily XP activities. As this manual activity involves more effort and time, it is better to switch to an online form.
  • Online Storyboard
    • Online tool Storyboard can be used to store the stories. Several teams can use it for different purposes.

Crystal Methodologies

Crystal Methodology is based on three concepts

  1. Chartering: Various activities involved in this phase are creating a development team, performing preliminary feasibility analysis, developing an initial plan and fine-tuning the development methodology
  2. Cyclic delivery: The main development phase consists of two or more delivery cycles, during which the
    1. Team updates and refines the release plan
    2. Implements a subset of the requirements through one or more program tests and integrates iterations
    3. Integrated product is delivered to real users
    4. Review of the project plan and adopted development methodology
  3. Wrap Up: The activities performed in this phase are deployment into the user environment, and post-deployment reviews and reflections are performed.

Dynamic Software Development Method (DSDM)

DSDM is a Rapid Application Development (RAD) approach to software development and provides an agile project delivery framework. The important aspect of DSDM is that the users are required to be involved actively, and the teams are given the power to make decisions. Frequent delivery of products becomes the active focus with DSDM. The techniques used in DSDM are

  1. Time Boxing
  2. MoSCoW Rules
  3. Prototyping

The DSDM project consists of 7 phases

  1. Pre-project
  2. Feasibility Study
  3. Business Study
  4. Functional Model Iteration
  5. Design and Build Iteration
  6. Implementation
  7. Post-project

Feature Driven Development (FDD)

This method is focused on “designing & building” features. Unlike other Agile methods in software engineering, FDD describes very specific and short phases of work that have to be accomplished separately per feature. It includes domain walkthrough, design inspection, promotion to build, code inspection and design. FDD develops products keeping following things in the target

  1. Domain object Modeling
  2. Development by feature
  3. Component/ Class Ownership
  4. Feature Teams
  5. Inspections
  6. Configuration Management
  7. Regular Builds
  8. Visibility of progress and results

Lean Software Development

The lean software development method is based on the principle of “Just in time production”. It aims at increasing the speed of software development and decrease cost. Lean development can be summarized in seven steps.

  1. Eliminating Waste
  2. Amplifying learning
  3. Defer commitment (deciding as late as possible)
  4. Early delivery
  5. Empowering the team
  6. Building Integrity
  7. Optimize the whole

Kanban

Kanban originally emerged from a Japanese word that means, a card containing all the information needed to be done on the product at each stage along its path to completion. This framework or method is quite adopted in software testing methods, especially in Agile concepts.


Scrum Vs Kanban

Scrum Kanban
  • In the scrum technique, tests must be broken down so that they can be completed within one sprint
  • No particular item size is prescribed
  • Prescribes a prioritized product backlog
  • Prioritization is optional
  • The scrum team commits to a particular amount of work for the iteration
  • Commitment is optional
  • Burndown chart is prescribed
  • No particular item size is prescribed
  • Between each sprint, a scrum board is reset
  • A Kanban board is persistent. It limits the number of items in the workflow state
  • It cannot add items to ongoing iteration
  • It can add items whenever capacity is available
  • WIP limited indirectly
  • WIP limited directly
  • Timeboxed iterations prescribed
  • Timeboxed iterations optional

 


Agile metrics:

Metrics that can be collected for effective usage of Agile are:

  • Drag Factor
    • Efforts in hours which do not contribute to the sprint goal
    • Drag factor can be improved by reducing the number of shared resources, reducing the amount of non-contributing work
    • New estimates can be increased by a percentage of drag factor -New estimate = (Old estimate+drag factor)
  • Velocity
    • Amount of backlog(user stories) converted to shippable functionality of sprint
  • No of the Unit Tests added
  • Time interval taken to complete daily build
  • Bugs detected in an iteration or in previous iterations
  • Production defect leakage